Parts gallery
Parts We Make
Have we made something like your part? Here is a sample of pipe, tube and profiles from our lines, with the material and what each one does.
- HDPE, PE, PP, rigid and flexible PVC, acrylic
- Co-extrusion, forming, chamfering, printing
- Shown without customer names
- Send your drawing for a quote
From our production floor
Most of these run today. Every part is made to a customer’s drawing on tooling the customer owns.
HDPE · secondary chamfering
8.5” HDPE roller sleeve
A non-standard 8.5” pipe that slides over a steel roller in box-making equipment. We chamfer the ends after extrusion so it slides onto the customer’s roller easily.
Flexible PVC + flexible PVC · co-extrusion
Duct with co-extruded safety stripes
Two yellow stripes extruded into the top of a floor duct in one run. Here both materials are flexible PVC; any two materials that bond in the die can be combined.
Flexible PVC
EF-3 cord cover with power
Our EF-3: a long flexible PVC duct that carries the cabling to an outlet box, bringing power from the wall to the middle of a room. The box housing comes from our sister division, HTI Plastics.
Flexible PVC
Flexiduct, MegaDuct and packaging profiles
Three Flexiduct sizes, the large black MegaDuct, and flexible PVC profiles we make for other companies’ packaging.
Flexible PVC · MDPE
Duct profiles and hinge covers
More flexible PVC duct, and simple MDPE covers that protect hinges while a product ships.
Acrylic and styrene blend
Clear tubes for reloading equipment
Clear tubes that hold gun powder in ammunition reloading equipment.
Acrylic and styrene blend
Cut, checked and packed in-line
The same clear tubes being cut to length, checked and boxed on the production floor.
Rigid PVC · forming · in-line printing
Formed and printed U-pipe
Rigid PVC pipe heated and formed into a U after extrusion, printed with the customer’s information during the run. Most of the time we print a date stamp for traceability.
HDPE · profile extrusion
Wear strip gauged for fit
A wear strip profile checked with calipers. Wear strips like this run under the moving floor of live-floor trailers.
MDPE · HDPE · polypropylene
Tubes built for outdoor equipment
Tubes with fittings and clamps for equipment that works outdoors year round, in every climate.
HDPE
Drive shaft tubes
HDPE drive shaft tubes for machinery that works outdoors, shipped in bundles.
Rigid PVC
Rigid PVC pipe, Schedule 80 style
Pipe much like Schedule 80, for customers who don’t need the Schedule 40 or 80 certification and would rather not pay for it.
Acrylic, PVC and other resins
Round profiles
We call these round profiles to set them apart from pipe: round shapes in many sizes, colors and resins. The clear and bright colored ones are acrylic.
Rigid PVC
Rigid profiles and channels
Rigid PVC profiles we have made for electrical conduit. The large yellow profile in the middle was made for a railroad car. The blue part was for a shopping cart handle.
Rigid PVC
Rigid conduit in color
Rigid PVC conduit profiles for electrical applications, in colors sourced to the customer’s Pantone specification.
A good fit
Buyers and engineers at small and midsize companies, OEMs and distributors. What we need are:
- Professional part drawings
- A material chosen for the application
- At least a full shift of production a year, about 10,000 feet or more
What we don’t do
We are honest about where our equipment and processes fit. We are not a good fit or do:
- High-tolerance parts: automotive, medical, aerospace, scientific
- Prototypes, and start-ups or inventors who need a part designed
- Commodity parts and very high volumes
Before you send a drawing
All FAQsWe respond within one business day. After a short conversation about the part, the part quote takes about 2 to 3 business days; the tooling quote follows when our tool builders send it.
Typically about $5,000 for a simple tube die and $15,000 to $60,000 for a profile, depending on size and complexity. It takes about 8 to 16 weeks to build and typically belongs to the customer: 50% to start the tool, 50% at first article approval, before full production begins.
A new part needs tooling first, which takes about 8 to 16 weeks to build. After that, established customers generally get parts in 2 to 10 days, depending on order size.
We look for at least a full shift of production a year, about 10,000 feet or more. Below that, the cost of tooling rarely makes sense for the customer.
We work to general plastic extrusion tolerances, which vary by material and size; see our tolerance guide (PDF). Cut length is +/- 1/16” on pipe, tube and rigid profiles, +/- 1/8” on flexible profiles. We don’t take high-tolerance work such as automotive, medical, aerospace or scientific parts.
Have a part like these?
Send the drawing, material, color and annual feet. We respond within one business day.
Or call (877) 828.5448 · sales@lincoln-plastics.com