Plastic tube leaving the extrusion die

Materials · PE

Custom Polyethylene Extrusion

Polyethylene pipe and tube in the diameter your equipment needs, not just the sizes in a catalog.

  • OD 1/8” to 8.5”
  • Walls 0.040” to 1”
  • Non-standard sizes to SDR standards
  • Any color with your additive package

Request a quote

Tell us what you need made. Every detail is optional except how to reach you.

Specialty polyethylene pipe, not commodity pipe

Plenty of extruders make standard-size pipe to SDR standards (the ratio of diameter to wall). We don’t compete there. We make polyethylene pipe and tube that still meets SDR standards in a non-standard size, for one special application.

One example: an 8.5” diameter HDPE pipe, five feet long, that slides over a metal roller in equipment that makes cardboard boxes. The cardboard runs over our pipe during production.

Pipe and tube are the parts we design tooling for most easily in-house, working with outside tool builders.

Operator chamfering the end of a large-diameter white HDPE pipe

How we work

Production, not prototypes

Tooling costs the same for 100 feet or 1,000,000 feet, so we quote production parts: at least a full shift of production a year, about 10,000 feet or more.

Short lead times

Once your tooling is in place, established customers generally get parts in 2 to 10 days, depending on order size.

Smaller orders than big extruders

A shift or two of production per order is enough for us, so you don’t have to stock large quantities of product at your plant.

Midwest location, lower freight

We ship from Lincoln, Nebraska, which keeps freight costs down for customers in the Midwest.

Polyethylene extrusion FAQ

All FAQs

Typically about $5,000 for a simple tube die and $15,000 to $60,000 for a profile, depending on size and complexity. It takes about 8 to 16 weeks to build and typically belongs to the customer: 50% to start the tool, 50% at first article approval, before full production begins.

We respond within one business day. After a short conversation about the part, the part quote takes about 2 to 3 business days; the tooling quote follows when our tool builders send it.

We’ll talk through how and where the part is used and share what we know from running each resin, and we can provide material specification sheets and put you in touch with material experts. You know your application in the field, so the material choice is yours.

We look for at least a full shift of production a year, about 10,000 feet or more. Below that, the cost of tooling rarely makes sense for the customer.

A new part needs tooling first, which takes about 8 to 16 weeks to build. After that, established customers generally get parts in 2 to 10 days, depending on order size.

Quote your polyethylene pipe or tube

OD, ID or wall, length, color and annual feet are enough to start. Tell us how the part is used and whether it works outdoors.

Or call (877) 828.5448 · sales@lincoln-plastics.com

Request a PE quote

Tell us what you need made. Every detail is optional except how to reach you.