Does the product fit a continuous extrusion process?
Continuous tube extrusion fits products made as long, continuous tubes or hollow profiles with a generally constant cross-section along the production direction. The process is steady-state: thermoplastic pellets or powder become a molten mass, pass through a die that forms the annular cross-section, cool, and move away from the die at a controlled rate.
That starting point gives you the first sourcing question: does your product remain substantially the same along its length? If the answer is yes, extrusion may fit the product form. If the design depends on a series of discrete parts, changing cross-sections, or features that cannot be produced continuously, you need a different process discussion or a secondary operation in addition to extrusion.
A continuous extrusion decision depends on more than the word tubing. Define the section that must repeat, the way the tube will be supplied, and the conditions it will face in service. A tube for an industrial machine, cable-protection system, outdoor component, or agricultural equipment may share the same basic process while requiring different material, geometry, tolerance, and qualification discussions.
Use this first screen before requesting prices:
- Identify the continuous cross-section and the features that must remain consistent.
- State whether the product will be spooled, cut to length, or transferred to another operation.
- Describe temperature, chemical, UV, flexibility, strength, and regulatory conditions.
- Separate dimensions that affect fit or function from dimensions that are informative only.
- State expected launch volume, recurring demand, and any qualification steps.
If you cannot describe the repeating section and its service conditions, treat the project as an engineering-definition task before treating it as a price-comparison task.
What happens during tubing extrusion?
Tubing extrusion converts thermoplastic feedstock into a continuous annular product through a sequence of controlled forming and cooling steps. The basic path is:
- Thermoplastic pellets or powder enter the extruder.
- The extruder forms a homogeneous molten mass.
- Pressure forces the melt through a die orifice that defines the tube’s cross-section.
- The formed material leaves the die and is cooled.
- A controlled draw removes the extrudate from the die.
- The tubing is spooled, cut to length, or directed into another in-line process.
The die establishes the opening through which the material flows, while cooling and draw conditions affect how the formed tube becomes the finished product. The process produces a continuous length rather than a separate molded piece for every part.
The extrusion process makes the cross-section and the production direction central to your RFQ. A supplier needs to understand the tube’s circular or shaped opening, wall requirements, cut or winding method, and the dimensions that must remain consistent over the run. The production method also means that die design, material flow, cooling, and draw control belong in the technical conversation rather than being treated as separate purchasing details.
Extrusion differs from injection molding and blow molding because extrusion is steady-state and produces long, continuous products with a generally constant cross-section. That distinction does not decide whether your complete product can be made, but it helps you separate a continuous tubing requirement from a discrete-part requirement. Describe any end features, holes, slots, bends, fittings, or assembly operations separately so the supplier can identify what belongs to the extrusion and what may require a later process.
A process-fit check should connect the product drawing to the production path. Ask yourself three questions:
- What portion of the product is a repeating tube or hollow profile?
- What happens immediately after the tube leaves the die?
- Which downstream steps are part of the supplied item rather than the extruded tube itself?
Those answers create a clearer boundary for the RFQ. They also prevent a supplier comparison from mixing die-made features with cutting, winding, assembly, or other in-line work.

Overview
The sourcing decision is easiest to evaluate as a requirements-to-RFQ exercise rather than as a search for a resin or a low unit price. Start with the process form, then define the application, material direction, geometry, tooling, volume, supply format, and qualification requirements.
The decision path is:
- Confirm that the product has a continuous tube or hollow-profile requirement.
- Describe the operating environment before naming a material.
- Classify the required behavior as flexible, semi-rigid, or rigid, then identify candidate resins or grades.
- Convert the drawing into critical dimensions, tolerances, and inspection expectations.
- Ask how die design and tooling will control shape and wall thickness.
- Provide launch and recurring volume information instead of a single unexplained quantity.
- Give suppliers a consistent RFQ packet so their responses can be compared.
- Separate general process education from project-specific engineering, qualification, and regulatory decisions.
A qualified supplier can respond more usefully when your request makes those decisions visible. A short but complete requirements package is more useful than a long request built around a material name alone.
Your working RFQ packet should identify what is known, what is provisional, and what still requires technical review. Tolerance development depends on the application, material, and manufacturing process, not simply on placing numbers on a drawing. Depending on the customer and project, supplier qualification may also involve specifications, drawings, quality and product-safety requirements, control plans, and documentation or test results.
Use those distinctions to keep the commercial request honest. Ask suppliers to identify assumptions, open technical questions, proposed validation steps, and commercial items separately.
How should the finished tubing be supplied?
Finished tubing can be supplied on a spool, cut to a specified length, or directed into another in-line process after cooling and drawing. Your supply format affects how you define the RFQ because the same continuous tube may become a different purchased item depending on cut length, winding, packaging, or downstream handling.
State the intended form at the start of the request:
- Continuous tubing on a spool or coil
- Cut lengths with a specified nominal length and allowed variation
- Tubing transferred directly into an in-line operation
- A combination of continuous supply and cut pieces for different production steps
Do not leave supply form as an informal production detail. It can affect the handoff between extrusion and your assembly, packaging, or machine-loading process.
A supplier-comparison request should ask how the proposed supply format will be controlled and documented. Include the following questions:
- What length, winding, or cut configuration will be quoted?
- What information must appear on each spool, bundle, or package?
- How will the supplier identify the material, revision, lot, and quantity?
- Will any in-line operation be included in the quoted scope?
- What packaging restrictions apply to prevent deformation or contamination during shipment?
These questions do not establish a required packaging method. They create a common response format so you can compare what each supplier is actually offering.
Supply format also gives you a useful boundary between extrusion and assembly. If your product requires formed ends, drilled openings, cutouts, fittings, or other discrete features, list them as separate requirements. Ask whether they belong in the supplier’s proposed scope or in your own downstream operation. Do not assume that a continuous tube quote includes every later conversion step.
A receiving and handling specification should describe how your facility will use the delivered tube. State the maximum package weight or dimensions your operation can handle, the available storage orientation, and whether the tube must arrive protected from crushing, kinking, or surface contact. Identify whether lot separation matters for your traceability process.
These details belong in the commercial packet because a technically acceptable tube can still create an avoidable handoff problem if its package format does not fit your equipment or storage process. Ask suppliers to separate included packaging from optional packaging and to list any handling assumptions in their response.
Define the application before naming a resin
Application conditions should guide the material discussion before a resin name appears in the RFQ. Tubing selection should account for application requirements, applicable compliance needs, chemical and temperature compatibility, flexibility, and strength. Material selection can also address operating temperature, UV resistance, color or opacity, flame resistance, rigidity, flexibility, abrasion resistance, and chemical resistance.
Describe the conditions in terms the supplier can evaluate:
- Normal, minimum, and maximum operating temperatures
- Contact with chemicals, oils, cleaners, fuels, water, or other substances
- Indoor or outdoor exposure and expected UV conditions
- Required flexibility, bend behavior, compression response, or rigidity
- Abrasion, impact, pressure, vacuum, or handling loads that matter to the application
- Required color, opacity, transparency, or surface appearance
- Any flame, food-contact, environmental, or other compliance requirement that applies
A condition list is more useful than a broad statement such as durable or industrial grade. Those labels do not define the material behavior your application needs.
Material selection belongs in a cross-functional discussion with the design, quality, regulatory, and resin-supplier functions that own the relevant requirements. You can give the extrusion supplier a candidate material, a required property set, or both, but do not treat a familiar resin name as proof of suitability. A supplier can discuss manufacturability and process implications; the project’s responsible technical functions must determine whether the selected material meets the application and compliance requirements.
An application summary for tubing extrusion should answer these questions:
- What does the tube contact during use?
- What temperature range must it withstand?
- Does the tube remain stationary, flex repeatedly, slide, compress, or carry pressure?
- Will sunlight or another exposure change the material requirement?
- Does the application require a documented compliance status or customer-specific approval?
- Which property is a hard requirement, and which is a preference?
Send the answers with the drawing. A drawing defines geometry, while the application summary explains why the geometry and material must behave in a particular way.
A material brief should distinguish operating conditions from desired product attributes. List the conditions that the tube must withstand first, then identify preferences such as color, transparency, surface appearance, or ease of handling. This order helps suppliers focus their response on requirements that can disqualify a candidate rather than treating every preference as equally restrictive.
Record the source of each requirement as well. Customer specifications, internal design standards, resin documentation, and end-use regulations may impose different obligations. Keeping those origins visible makes it easier to identify which question belongs with engineering, quality, regulatory, or purchasing.
Use tubing behavior to narrow material categories
Plastic tubing materials are commonly grouped as flexible, semi-rigid, or rigid, with resin choices varying by category. The categories help you organize the first discussion, but they do not identify a specific grade or establish application suitability.
Examples include flexible PVC, LDPE, LLDPE, and polyurethane for flexible tubing; PP and HDPE for semi-rigid tubing; and rigid PVC, ABS, polycarbonate, HIPS, and acrylic for rigid tubing. PVC can range from soft and rubbery to rigid, so the word PVC alone does not describe the required behavior. Your RFQ should identify the intended behavior and service conditions rather than relying on the category label.
Use the categories as a screening sequence:
- Flexible tubing: define the bend, recovery, handling, and environmental requirements that make flexibility necessary.
- Semi-rigid tubing: define the balance between form retention and movement, along with temperature, chemical, and strength conditions.
- Rigid tubing: define the dimensional stability, impact, abrasion, chemical, and appearance requirements that must remain consistent.
The categories are not a ranking. They are a way to make the required behavior explicit before you compare candidate materials.
A material section in your RFQ should include the following information:
- Customer-specified resin, grade, or formulation, if already established
- Candidate material or property direction, if the choice remains open
- Required temperature range and chemical exposures
- Required flexibility or rigidity
- UV, flame, abrasion, impact, or chemical-resistance requirements
- Color, opacity, surface, and identification requirements
- Additives or properties that must be included, if applicable
- Documents needed to support material identification or qualification
Extrusion can accommodate different production volumes and can incorporate additives for properties such as UV, fire, or chemical resistance, but those general process points do not prove that a particular formulation meets your project. Ask the supplier and resin source to identify the proposed material and the basis for its selection.
A material category is a starting point, not an approval. If the tube has a regulated use, unusual exposure, demanding temperature range, or safety-related function, keep the material decision with the qualified technical and regulatory functions responsible for that application. Ask for the supplier’s proposed grade and supporting documentation before treating the material direction as settled.
A material decision record should show why each candidate remains under consideration. For every candidate, list the required behavior, known operating conditions, open compatibility questions, expected documentation, and the function responsible for approval. Remove a candidate when a defined requirement cannot be met, but keep the reason attached to the requirement rather than describing the resin as generally unsuitable.
This record gives purchasing a clear basis for requesting comparable supplier responses. It also prevents a preliminary recommendation from becoming an unreviewed material commitment.
Translate geometry into manufacturable requirements
Tube geometry should describe the repeating cross-section, the dimensions that control fit, and the dimensions that control function. Extrusion produces a generally constant cross-section along the production direction, so your drawing should make the cross-section easy to interpret and should separate continuous dimensions from cut-length or end-feature requirements.
Include, as applicable:
- Outside diameter or overall external dimensions
- Inside diameter, opening shape, or passage dimensions
- Nominal wall thickness and any areas with different wall requirements
- Concentricity or relationship between the inside and outside surfaces, if function requires it
- Cross-section features such as ribs, grooves, slots, lips, or multiple openings
- Cut length, end condition, and allowable length variation
- Drawing revision, units, datum references, and critical-to-function dimensions
Use a clear drawing and a short written description. The written description should explain what each critical dimension controls in the assembled product.
Extrusion tolerances should be developed from the application, material, and manufacturing process rather than added to a drawing without context. A tight number may be necessary for one interface and unnecessary for another; the supplier needs to know which is which before proposing a process and inspection approach.
Mark dimensions by function:
- Critical: the dimension must support fit, sealing, movement, or another defined function.
- Controlled: the dimension affects assembly or appearance but has some permitted range.
- Informational: the dimension communicates design intent without being a release criterion.
Pair every critical tolerance with its purpose. For example, explain whether a diameter controls insertion, a wall dimension controls clearance, or a length controls assembly position. Do not request a tolerance solely because a prior drawing used it.
Inspection requirements should match the dimensions and conditions that matter to the product. Ask the supplier to identify the proposed measurement method, sampling approach, and records for critical dimensions. If your organization already has a control plan, inspection standard, or acceptance procedure, attach it to the RFQ instead of describing it indirectly.
A tolerance conversation is also a process conversation. Ask what assumptions about material, die design, cooling, draw, and measurement are built into the proposed tolerance. Keep the limitation beside the conclusion: a supplier cannot confirm a project-specific tolerance from a generic tubing description alone.
Before sending the drawing, check that the package answers four questions:
- What cross-section must repeat along the tube?
- Which dimensions determine fit or function?
- Which tolerances are required, and why?
- Which requirements apply to the continuous tube versus the cut or finished piece?
This checklist keeps geometry, process, and acceptance criteria connected. It also gives each supplier the same technical starting point.
A drawing-control note should identify the released revision, obsolete revisions, units, file formats, and the person responsible for technical questions. If the drawing is still changing, label the dimensions that are provisional and state the date or event that will define the next release. Send the same revision to every supplier in the comparison.
A supplier response should reference the drawing revision used for its assumptions. That simple control makes later changes easier to trace and prevents a price, tooling proposal, or tolerance discussion from being attached to the wrong geometry.
Ask how tooling will control the tube
Extrusion tooling shapes the tube and influences circular shape, wall-thickness uniformity, material flow, and surface condition. Die design can influence uneven flow, melt fracture, and surface imperfections. Tooling complexity varies by application, and intricate products require more specialized die engineering than simple pipe extrusions.
Your RFQ should therefore ask for a tooling discussion, not only a tooling price. Request the supplier’s view on:
- Die approach for the proposed cross-section
- Features that may make the tool more complex
- How wall thickness and shape will be controlled
- Which dimensions require special attention during setup or production
- Whether the proposed tooling is new, modified, or reusable
- Tool ownership, maintenance, revision, and storage terms
- What trial, sample, or approval steps are included before production release
The supplier’s response should distinguish a tooling assumption from a confirmed project plan.
Compare tooling responses by the questions they answer. A lower quoted tooling charge is not meaningful if the response leaves die scope, ownership, revision control, or approval criteria unclear. Ask each supplier to identify the proposed tool, the included development work, the information needed from you, and the conditions that could change the proposal.
Do not infer a tooling outcome from the tube’s outside shape alone. Wall requirements, internal features, material behavior, tolerances, and the required supply format can all change the technical discussion. Keep the final tooling decision tied to the approved drawing, material direction, and application requirements.
Send the latest drawing and revision history with the RFQ, then ask the supplier to flag any feature that may affect flow, cooling, measurement, or downstream handling. If you need multiple colors or materials, state that requirement as part of the cross-section definition rather than adding it after the tooling response. The supplier can then address the complete profile instead of pricing an incomplete shape.
Tool ownership should be treated as a separate commercial question from tool design. Ask who owns the physical tool, who pays for modifications caused by a drawing revision, who authorizes maintenance, and how the tool is identified in records. Ask what happens if the program is paused or the product changes.
These questions do not determine the technical design. They define the responsibilities attached to the proposed tooling so that purchasing can compare offers with the same scope.
Match the production request to process and volume
Production volume belongs in the process decision because extrusion produces continuous profiles and can accommodate small or large production volumes. A single annual quantity does not describe the full supply requirement, however. The supplier also needs to understand launch demand, order pattern, run length, cut or spool format, and the timing of any approval stages.
Give suppliers a volume profile rather than an isolated number:
- Prototype, sample, or first-article quantity
- Expected initial production quantity
- Recurring annual demand or forecast range
- Order frequency and preferred release size
- Required spool, coil, or cut-length quantity
- Known seasonal or program-related changes
- Inventory, packaging, or delivery constraints that affect releases
Those details help suppliers respond to the production request you actually have instead of a quantity stripped of context.
Ask each supplier to separate the commercial stages in the response. A useful request distinguishes sample or development work, tooling, production pricing, packaging, freight assumptions, and any minimum release or run conditions. Ask for proposed lead-time assumptions rather than treating a generic promise as a project schedule.
Those items depend on the defined product, material, tooling, supply format, and supplier process. Require the response to identify the assumptions behind each commercial figure or schedule.
A production-fit review should connect demand to the continuous nature of the process. Ask whether the proposed spool or cut format matches your equipment, storage, and assembly flow. If the product will move directly into another operation, describe that handoff and identify the required interface. If the demand is uncertain, provide a range and ask suppliers to state how their response changes across the range.
A delivery request should separate the dates that purchasing controls from the dates that depend on technical approval. State when drawings, material decisions, samples, approvals, and production releases are expected. Ask suppliers to identify the assumptions behind each proposed milestone and to separate tooling or sample timing from recurring production timing.
Use the same schedule fields for every supplier. A response that combines development, approval, and production into one date cannot be compared fairly with a response that separates those stages.
Build a supplier-comparison RFQ packet
A supplier-comparison RFQ packet should give every supplier the same technical, commercial, and qualification starting point. Organize the packet into sections so you can compare like with like:
1. Project and contact information
- Product name, part number, and drawing revision
- Purchasing, engineering, quality, and regulatory contacts
- Intended application and equipment or assembly context
- Required confidentiality or document-handling terms
2. Product definition
- Drawing and three-dimensional files, if applicable
- Cross-section description and critical features
- Required outside, inside, wall, length, and feature dimensions
- Critical tolerances and the function connected to each one
- Surface, color, opacity, marking, and appearance requirements
3. Material direction
- Customer-specified resin or grade, if established
- Candidate material or property requirements, if open
- Temperature, chemical, UV, flame, abrasion, flexibility, and strength conditions
- Required compliance documents, approvals, or material records
4. Supply format
- Spool, coil, cut length, or in-line handoff
- Quantity per package and identification requirements
- Packaging, storage, and handling restrictions
5. Demand and delivery
- Sample and launch quantities
- Recurring volume and order pattern
- Requested delivery location and release schedule
- Inventory or seasonal requirements
6. Quality and qualification
- Inspection, sampling, and documentation expectations
- Control-plan requirements, if already defined
- Product-safety requirements, if applicable
- Test results, certificates, records, or approval samples needed for release
7. Requested supplier response
- Material and grade proposed
- Tooling scope, ownership, and assumptions
- Process or manufacturability questions
- Sample and approval plan
- Unit pricing, tooling charges, packaging, freight assumptions, and schedule assumptions
- Open items that prevent a firm response
A comparison matrix should use the same response fields for every supplier. Create columns for technical fit, material assumptions, critical dimensions, tooling scope, sample plan, quality records, supply format, volume assumptions, delivery stages, pricing basis, and open questions. Mark each field as confirmed, proposed, conditional, or unanswered.
Do not turn the matrix into a score that hides unresolved requirements. A supplier with a lower price but unanswered tolerance, tooling, or qualification questions still has an incomplete response. Use the matrix to direct follow-up, then retain the supplier’s written assumptions beside the comparison record.
Before issuing the RFQ, appoint a single owner for questions and define how supplier clarifications will be shared. Release the same drawing, application summary, volume profile, and response template to every invited supplier. Record substitutions, addenda, and answered questions so each response reflects the same information.
A controlled issue process protects the comparison from accidental differences in scope. It also gives engineering, quality, and purchasing a common record when the initial responses are reviewed.
Separate supplier qualification from general process education
Supplier qualification is a project-specific review, while general process education explains how tubing extrusion works. The two activities support each other, but neither should be used as a substitute for the other. A process overview can help you ask better questions; it cannot approve a supplier, material, drawing, control plan, or product-safety requirement.
Depending on the customer and project, qualification may involve reviewing specifications, drawings, quality and product-safety requirements, control plans, and documentation or test results. Define which of those items apply to your program and identify who owns each approval.
Separate your supplier review into practical stages:
- Capability discussion: Confirm that the supplier understands the continuous cross-section, material direction, supply format, and volume request.
- Technical review: Resolve geometry, tolerances, tooling, inspection, and process questions.
- Sample or approval review: Compare supplied samples and records with the approved requirements.
- Qualification review: Complete the customer, quality, product-safety, control-plan, and documentation requirements that apply.
- Production release: Approve the defined product, process, records, and commercial scope through your organization’s process.
The stages may overlap, but keep their decisions distinct in your records.
We are certified to the ISO 9001 standard. That certification is a business-specific fact, not a substitute for your own customer, product, regulatory, or qualification requirements. State the records and approvals your program requires, then ask each supplier to identify what it can provide and what remains for your organization to approve.
A supplier review scorecard should separate capability evidence from commercial preference. Record whether each supplier answered the geometry, material, tooling, inspection, qualification, supply-format, volume, and schedule questions. Record commercial terms only after the technical scope is clear enough to compare.
Use a written disposition for every unresolved item: supplier clarification, internal engineering review, quality approval, regulatory review, or removal from consideration. That disposition keeps purchasing from treating an unanswered question as an implicit acceptance.
Know what an early sourcing decision cannot establish
An early tube-extrusion review cannot establish project-specific suitability from a material label, generic process description, or preliminary quotation. General guidance can identify the questions to resolve, but the final decision depends on your application, approved geometry, material direction, tolerances, tooling, qualification requirements, and supply conditions.
Keep the following boundaries visible:
- A material category does not establish a grade or confirm chemical and temperature compatibility.
- A drawing tolerance does not prove that the tolerance is necessary or producible without process context.
- A supplier’s general tubing experience does not approve your particular cross-section or application.
- A tooling discussion does not establish final dimensions until the design, material, process, and inspection approach are reviewed.
- A proposed price or schedule does not establish a production commitment until scope and assumptions are agreed.
- ISO 9001 certification does not replace customer-specific quality, product-safety, regulatory, or validation requirements.
Treat each item as an open decision until the responsible technical or quality function approves it.
Project-specific engineering or regulatory review is warranted when the tube carries a safety-related function, contacts a regulated product or substance, faces unusual chemical or temperature exposure, requires a customer or industry approval, has tight fit or sealing requirements, or depends on a documented test result. Review is also needed when your drawing, material choice, tolerance, or qualification package contains unresolved assumptions.
Prepare the technical package before asking for a final decision. Include the application conditions, latest drawing, candidate material or required properties, critical tolerances, supply format, demand profile, and required records. A qualified engineer or regulatory function can then decide which tests, approvals, and acceptance criteria apply to your project.
Use uncertainty as a reason to improve the RFQ, not as a reason to force an early material or supplier choice. Mark each unknown, assign an owner, and ask the supplier to state the information needed to close it. That record gives purchasing, engineering, quality, and regulatory teams a shared basis for the next decision.
Your next action should follow the state of the requirements:
- If the repeating cross-section, application conditions, and supply format are defined, issue a structured RFQ and request supplier assumptions.
- If the geometry is defined but material behavior or tolerance needs are uncertain, obtain technical review before comparing final commercial offers.
- If the product has regulated contact, a safety-related function, or a customer approval requirement, assign the applicable engineering and regulatory review before release.
- If the product includes substantial discrete features, separate those operations from the continuous tube scope before selecting a supplier.
Each branch keeps the sourcing decision aligned with what is actually known.
Request an application-specific review from Lincoln Plastics
Prepare your request with the application, cross-section drawing, critical dimensions and tolerances, material direction, operating conditions, supply format, launch and recurring volume, delivery assumptions, and qualification or documentation requirements. A qualified engineer or regulatory professional must decide individual suitability, compliance, and approval requirements for your application.
A complete requirements package gives us the information needed to respond to the defined project rather than to a material name or incomplete tube description.
What should an OEM include when asking about custom tubing extrusion?
What is the tubing extrusion process?
Tubing extrusion is a continuous manufacturing process where thermoplastic pellets or powder are melted into a homogeneous mass and forced through a die to create a tube with a consistent cross-section. The extrudate is then cooled and can be cut to length or wound on a spool.
What factors should be considered when selecting materials for tubing extrusion?
When selecting materials for tubing extrusion, consider application requirements, regulatory compliance, chemical and temperature compatibility, flexibility, strength, and any specific performance characteristics needed for the intended use.
How do I prepare an RFQ for custom tubing extrusion?
To prepare an RFQ for custom tubing extrusion, include details such as the product drawing, critical dimensions, tolerances, material specifications, application conditions, supply format, expected volumes, and any quality or compliance requirements.
What are the common materials used in tubing extrusion?
Common materials for tubing extrusion include flexible PVC, LDPE, LLDPE for flexible tubing; PP and HDPE for semi-rigid tubing; and rigid PVC, ABS, polycarbonate, HIPS, and acrylic for rigid tubing.
What should I include in the supply format for tubing?
Specify whether the finished tubing will be supplied on a spool, cut to a specified length, or directed into another in-line process. Include any packaging or handling requirements to ensure safe delivery.
When is project-specific engineering review necessary for tubing extrusion?
Project-specific engineering review is necessary when the tubing has safety-related functions, contacts regulated substances, requires compliance approvals, or has specific performance requirements that must be validated.

